Project Description
Upgrade of dispatching system
-
Dispatching SW modification – replacement of the existing SIMATIC WinCC v5.1 SP2 visualisation with a newer SIMATIC WinCC v7.3 version
-
Establishment of a new communication network in a circular topology
-
Replacement of operator stations
-
Regulation and monitoring of hot water distribution service nodes (7 stations) installed at selected locations of the hot water distribution system in Banská Bystrica.