Project Description
Engineering activities – ELECTRICAL and CMS for MO34 – Secondary part
Scope of work:
- Project management
- Project documentation of the “Detail Design” stage
- Documentation of the actual construction
- Project supervision on site
- Inspection on site
- Handling of project deviations
- Resolution of potential collisions
- Proposal of alternative solutions arising during implementation
- Processing of 3D PDMS model
- Main and side cable routes (> 200 mm)
CMS and Electrical switchboards and project documentation for the Electrical part:
- Layout of the location of equipment
- 2D drawings of main and side cable routes and the layout of beams
- 2D drawings fire protection cable routes
- 2D drawings of grounding of cable routes
- Computing reports – sizing of cables
- Lists of cable route sections
- Design and localisation plan of power cables
- Setting electrical protection of devices
- Interconnection diagrams
- Technical reports
- Bill of material