PAINT SHOP – complete execution of the electrical part, measurement and regulation (M&R), fire alarm system (FAS) and evacuation intercom (EI):

  • main and emergency lighting
  • control system of main and emergency lighting
  • transformer stations – 22 kV/400 V transformers, including standby transformer control
  • switchboards (high-voltage, 22 kV; main low-voltage switchboards, active filters and compensation switchboards; secondary low-voltage switchboards)
  • HV and LV cable routing and cabling
  • fire alarm system and evacuation intercom
  • measurement and regulation – the Building Management System
  • lightning conductor
  • earthingwithin the scope of: project documentation preparation, delivery and installation of equipment and material, production of main (socket-outlet) and secondary (cubicle) low-voltage switchboards, complex testing, inspections and examinations and commissioning of the equipment delivered. The project execution also complied with the Breeam standard (to achieve the required EXCELLENT level for the building.)

TRAINING CENTRE

  • production and delivery of LV switchboards
  • cable routing and cabling for LV mains and for the light-current distribution system
  • main and emergency lighting
  • fire alarm system and evacuation intercom
  • lightning conductor
  • earthing
  • structured cabling
  • access control system, camera system, security system, emergency call system for disabled peoplewithin the scope of delivery and installation of equipment and material, complex testing, inspections and examinations and commissioning of the equipment delivered.

ENERGY CENTRE

  • the execution of building earthing

SERVICE CONTRACT