Project Description
1. Heavy current
-
Delivery and installation of transformers and transformer terminals of the LV side
-
LV and compensation switchboards
-
Climbing routes and cable routes for the HVAC system, electrical installations, measurement and control
-
Switchboards for each floor
-
Complete cable system for the HVAC system and for measurement and control
-
Lighting
-
Emergency lighting – central battery system
-
Diesel generator
-
Lightning rod, grounding and potential compensation
-
Heating of a drive-up ramp
2. Light current
-
Electric fire signalling
-
Centres for pressure ventilation
-
CCTV system
-
Access control
-
Intercom for entry into various parts of floors
-
Parking system in the garages, including a payment system for parking spaces and ramps
-
Security equipment
-
Evacuation radio system
-
Assistance signalling system for the handicapped in toilets
-
TV cabling