Project Description
PPA CONROLL, Inc. implemented complete technological part of the Horelica tunnel – 600 m as the general contractor for VÁHOSTAV-SK, Inc.
Commissioning in 11/2004
-
Power supply of the tunnel (22 KV substation, LV switchboard – power supply of technological equipment, UPS and diesel generator)
-
Lighting of the main tunnel and the escape tunnel, fire and emergency lighting
-
Supply of the central control system
-
Measurement of physical quantities – opacity, CO, air flow, differential pressure, temperature
-
Drive-simulator for operators with a simulation of incidents
Security system (SOS boxes, closed TV circuit + transmission of images to the police and the Fire and Rescue Corps)
-
Electric fire signalling system
-
Wireless connection in the tunnel
-
Ventilation of the main tunnel tube and the escape tunnel
-
Traffic control (variable message signs and traffic lights)